A. Drawing Review & Coordination
• Receive and maintain all drawings/documents received from consultants. Maintain all drawings and data as per standard system.
• Review architectural, structural, MEPF, landscape, façade, interior, infrastructure, and specialist consultant drawings.
• Check drawings for completeness, accuracy, and compliance considering project specifications and check-list.
• Identify discrepancies, missing information, clashes, and coordination issues between different disciplines.
• Coordinate with consultants to resolve technical and design-related issues.
• Ensure all drawings are compatible with site conditions and construction methodology, including: a. cost efficiency b. Prepare drawings that can give following results: c. minimum wastage d. maximum usability e. ease of execution f. aesthetic appeal g. long-term durability h. low-cost maintenance .
• Provide design inputs and recommendations to incorporate value engineering and achieve the desired outcomes from drawings based on the principles mentioned above. B. Interdisciplinary Coordination
• Coordinate between Architecture, Structure, MEPF, Landscape, Façade, Interior, Infrastructure, and other consultants, purchase team, agencies, suppliers, contractors and legal team.
• Conduct drawing coordination reviews to identify clashes and to ensure all services are rightly planned before drawings are issued for construction. C. GFC Drawing Preparation & Issuance
• Ensure all required consultant revisions are incorporated before GFC issuance.
• Prepare/check the final coordinated drawing package for site execution.
• Ensure drawings have the correct revision number, approval status, date,
and issue purpose .
• Issue only approved and coordinated drawings to the Site Execution Team.
• Maintain a proper record of all GFC drawings issued to site. Department Planning. Designation Executive. Reporting to Leader. D. Site Support
• Provide timely drawing clarifications to the Site Execution Team to avoid delay in work progress at site due to unviability of final GFCs or unresolved queries.
• Coordinate with consultants for resolution of site queries.
• Review site requirements and identify drawing gaps affecting execution.
• Ensure revised drawings are issued promptly when design changes occur.
• Coordinate with site teams to understand recurring drawing-related execution issues.
• Participate in site meetings when required for technical/design coordination. E. Revision & Document Control
• Maintain a master drawing requirement schedule for all disciplines.
• Track drawing submissions, comments, revisions, approvals, and GFC status.
• Ensure superseded drawings are withdrawn from circulation.
• Maintain proper records of consultant submissions and responses.
• Establish explicit control over the latest approved drawings available at site.
• Monitor pending drawings and follow up with consultants for timely submission.
• Escalate critical delays or unresolved technical issues to Project Management. F. BOQ & Quantity Estimation
• Prepare BOQ and quantity.
• Verify quantities based on approved drawings, designs and project requirements.
• Coordinate with the technical team and purchase teams regarding material requirements.
• Prepare area statement as per requirement and standard practice.