04 Nov
|
Jindal Steel
|
Angul
04 Nov
Jindal Steel
Angul
Role Objective
Dual leadership role responsible for governing daily refractory reliability, turnaround maintenance, and cost optimization for operating Pellet Plant 1, while directing end-to-end refractory engineering, material procurement, lining installation, dry-out, and commissioning for the Pellet Plant 2 project. This position bridges project execution and sustained operational performance to ensure seamless plant integration, zero unplanned outages, and optimized refractory lifecycle costs.
Key Responsibilities
PP-2 Project Execution, Erection & Commissioning
- Direct all refractory erection and commissioning activities for Pellet Plant 2 from engineering design review to initial light-up and handover.
- Scrutinize refractory layout drawings, lining profiles, anchoring systems, expansion joint design, and thermal insulation calculations across the induration furnace, rotary kiln, burner hood, annular cooler, and waste gas ducts.
- Manage refractory installation contractors in office, supervising daily masonry execution, castable pouring, gunning, shotcreting, and curing to ensure adherence to engineering tolerances.
- Formulate and execute controlled initial dry-out schedules and heating-up curves to prevent explosive spalling, thermal cracking, and structural lining damage during plant light-up.
- Supervise pre-commissioning refractory inspections, thermal audits, and refractory performance during Performance Guarantee (PG) test runs.
PP-1 Operational Governance & Maintenance Management
- Formulate and implement the Annual Refractory Master Plan and preventive maintenance schedules for Pellet Plant 1 to maximize campaign life and equipment uptime.
- Direct cold and hot refractory repairs across all operating thermal zones: drying zones, pre-heating zones, firing/burning zones,
and discharge ends.
- Plan and execute major capital relining and annual turnaround shutdowns within targeted timeframes and cost parameters.
- Optimize operational costs by reducing specific refractory consumption ($kg/tonne$ of pellets produced) and driving transitions from conventional brickwork to monolithic linings where technically beneficial.
- Drive scrap reclamation initiatives to process discarded refractory material into reusable in-house aggregates, reducing operational waste.
Quality Assurance, Testing & Failure Analysis
- Direct incoming inspection and laboratory testing of refractory materials (bricks, monolithic castables, mortars, ceramic blankets, and metallic anchors).
- Validate critical material properties including Cold Crushing Strength (CCS), Permanent Linear Change (PLC), Refractoriness Under Load (RUL), Bulk Density, and chemical compositions before installation.
- Conduct root cause analysis (RCA) on premature lining wear, hot spots, shell deformation, and anchor failures in PP-1, incorporating lessons learned into the PP-2 design and execution phases.
- Conduct regular infrared thermography surveys and shell temperature profiling on operating vessels to preempt breakout hazards.
CAPEX/OPEX Budgeting, Procurement & Vendor Management
- Formulate and manage the annual CAPEX budget for PP-2 refractory procurement and the annual OPEX budget for PP-1 refractory maintenance.
- Evaluate techno-commercial bids from domestic and international refractory suppliers and application contractors, negotiating scopes for supply, application, and Cost-Per-Tonne (CPT) performance contracts.
- Coordinate closely with Project, Purchase, and Warehouse teams to maintain optimal inventory levels of operational consumables and project buffer stocks without inventory lock-in.
- Supervise supplier factory audits and conduct structured plant trials for next-generation refractories and energy-saving insulation systems.
Safety, Housekeeping & Team Governance
- Enforce industrial safety regulations, confined-space entry permits, working-at-height standards, and hot-work protocols across both project and operating sites.
- Formulate Standard Operating Procedures (SOPs) and Job Safety Analyses (JSAs) for project casting, heavy demolition, and kiln relining operations.
- Direct and upskill an internal team of refractory engineers, frontline supervisors, and contractor masons through structured technical training programs.
Key Performance Indicators (KPIs)
- PP-2 Project Milestone Compliance: Zero project delays attributed to refractory material delivery, installation, or dry-out execution.
- Equipment Availability: Zero unplanned refractory outages and maximum campaign uptime in PP-1.
- Thermal Performance: Smooth light-up and first campaign integrity of PP-2 lining systems with zero hotspot formation.
- Cost Governance: Adherence to PP-2 CAPEX budget and reduction of specific refractory consumption ($kg/tonne$) in PP-1.
- Safety: 100% adherence to zero-harm safety standards and zero Lost Time Injuries (LTIs) across operational and construction zones.
📌 Section Incharge (Angul)
🏢 Jindal Steel
📍 Angul