07 Nov
|
Dhanush Mepcentre
|
Kolkata
07 Nov
Dhanush Mepcentre
Kolkata
Project Manager MEP Work location Bangalore Airport Experience 7 to 8 years Scope Of Work 1. Pre-Construction & Design Coordination
• Clash Detection & BIM/Autocad Review: Lead BIM/Revit coordination meetings to resolve spatial clashes between HVAC ducts, cable trays, fire lines, plumbing pipes, and structural elements (beams, slabs, shafts).
• Drawing Validation: Review and approve Positive for Construction (GFC) drawings, shop drawings, schematics, and builder's work drawings (core-cut and sleeve locations) before work starts. 2. Procurement, Contracts & Commercial Management
• Technical Bid Evaluation (TBE): Evaluate subcontractor quotes and equipment proposals against project design criteria and approved vendor lists.
• Material Submittals & Approvals: Scrutinize Material Inspection Requests (MIRs) and technical data sheets for major plant equipment (chillers, transformers, DG sets, pumps, panels, AHUs, fire alarm systems).
• Billing & Variations: Verify contractor measurement sheets, certify running account (RA) bills, and assess subcontractor variation claims against the original Bill of Quantities (BOQ). 3. Site Execution & Interface Management
• Civil-Structure Alignment: Ensure wall openings, slab sleeves, cast-in conduits, and foundation plinths for heavy machinery (e.g., chillers, cooling towers, transformers) are executed on schedule before structural concrete pours.
• Daily Progress Monitoring: Track execution milestones using Gantt charts/Primavera/MS Project against the master project schedule.
• Inter-Disciplinary Alignment: Resolve boundary issues between specialized trades (e.g., BMS controls vs. HVAC dampers; fire pump room piping vs. electrical starter panels).
• Weekly/Daily Meeting: Need to attend site co-ordination meeting with client and other vendors. 4. Quality Control, Safety & Statutory Compliance
• QA/QC Enforcement: Implement the MEP Quality Inspection Plan (ITP), verify pressure testing (hydro-testing of chilled water, firefighting, and domestic lines), insulation integrity, and cable megger testing.
• HSE Compliance: Enforce site safety standards for hot works (welding/brazing), working at heights, confined space entries (shafts, tanks), and lock-out/tag-out (LOTO) procedures.
• Liaison & Authority Clearances: Secure statutory approvals and inspections, including: o Electrical Inspectorate (CEIG / State Electrical Board) for substations, HT panels, and DG sets. o Fire & Emergency Services for fire pump operations, hydrants, sprinklers, and life safety NOCs. . 5. Testing, Adjusting, Balancing & Handover (TAB & T&C;)
• Pre-Commissioning Checks: Verify dry-run procedures, electrical phasing, rotational checks on motors/pumps, and duct air-leakage tests.
• Integrated Testing: Conduct integrated building system tests (e.g., initiating a fire alarm trip to confirm that AHUs trip, stairwell pressurization fans activate, access control doors unlock, and elevators recall to ground level).
• Handover Documentation: Compile As-Built drawings, Operation & Maintenance (O&M;) manuals, warranty/guarantee certificates, spare parts lists, and train the client's facility management (FM) team. Essential Technical Knowledge Matrix Service Domain Key Systems Managed Mechanical (HVAC) Chillers, VRF/VRV units, AHUs, FCUs, ventilation fans, duct networks, chilled water piping, balancing valves. Electrical (HT / LT) Transformers, HT/LT panels, busducts, DG sets, UPS, cable trays, earthing grids, lightning protection, internal/external lighting. Plumbing & PHE Water supply networks, hydro-pneumatic pumping systems, drainage, rainwater harvesting, Water Treatment Plants (WTP), and STPs. 6. Must be knowing MSP – Microsoft Project for preparation of Schedule.
📌 Project manager MEP (Kolkata)
🏢 Dhanush Mepcentre
📍 Kolkata