Role Type
Project Site Engineer/ PMC monitoring/ governance role
Certification / Training
Appointed Person / lifting supervisor / heavy-lift planning certification preferred; crane manufacturer, rigging and transport-safety training desirable.
Overview
Coordinate heavy component logistics, main crane and auxiliary crane erection readiness, crane movement planning and lift-sequence monitoring for Wind construction activities.
Accountability Boundary
Coordinates logistics and lifting readiness; Contractor/crane agency executes lifting operations, HSE verifies safety controls and Erection Engineer monitors WTG mechanical completion.
Core Duties & Responsibilities
- Coordinate main crane and auxiliary crane mobilization, erection readiness, dismantling and movement sequencing between WTG locations.
- Review lift readiness inputs including route/access condition, crane pad readiness,
component delivery sequence, rigging readiness and crane utilization constraints.
- Monitor WTG component unloading, laydown, preservation and handover readiness in coordination with Store/Inventory and Erection teams.
- Coordinate lifting sequence interfaces with civil, mechanical erection, HSE, logistics and contractor teams without assuming contractor execution responsibility.
- Track crane movement constraints, logistics bottlenecks and recovery actions affecting erection productivity.
Principal Client-Facing Outputs
- Crane and heavy-lift readiness tracker.
- Crane movement/logistics constraint register.
- WTG component logistics and erection-readiness inputs.
📌 Mechanical Engineer- Crane , Logistic & Heavy Lift (Khavda)
🏢 Aecom
📍 Khavda