10 Nov
|
StepsWorths Consultancy Services
|
Chandigarh
10 Nov
StepsWorths Consultancy Services
Chandigarh
:
1. ICT Machine Operation
- Operate ICT equipment according to approved SOPs, work instructions and test procedures.
- Load and run the correct ICT test program for the respective PCB/PCBA model.
- Verify product part number, revision and test program before starting testing.
- Perform equipment start-up and shutdown according to defined procedures.
- Load/unload PCBAs carefully into/from the ICT fixture.
- Ensure correct positioning and orientation of assemblies before initiating test cycles.
- Monitor test equipment for alarms, abnormal conditions and interruptions.
1. ICT Test Execution
- Execute approved ICT test sequence for manufactured PCBAs.
- Verify electrical parameters as defined in the released test specification/program.
- Perform PCBA testing for applicable checks such as:
- Open circuits
- Short circuits
- Resistance
- Capacitance
- Diode characteristics
- Connectivity
- Component presence/orientation where supported
- Other electrical checks defined by the approved test program
- Ensure the complete defined test sequence is executed before product release.
- Never bypass failed tests or modify test limits without authorization.
1. PASS / FAIL Verification
- Review ICT test results and correctly identify PASS and FAIL PCBAs.
- Ensure only PASS assemblies move to the next process.
- Clearly segregate failed assemblies according to the defined procedure.
- Prevent mixing of tested, untested, PASS, FAIL, Hold and Rework material.
- Escalate unclear or abnormal test results to the responsible Engineer.
- Never manually override a FAIL result without authorized technical disposition.
1. Defective PCBA Segregation
- Place failed PCBAs in identified NG/Hold/Rework locations.
- Attach or record appropriate failure identification.
- Maintain linkage between failed PCBA and ICT failure information.
- Prevent defective products from progressing to subsequent operations or dispatch.
- Ensure rejected boards are transferred only through the defined rework/analysis process.
- Maintain proper physical and system control of failed assemblies.
1. Failure Identification & Feedback
- Record the failure code/type generated by ICT equipment.
- Identify repetitive/common failures and immediately inform Production/Quality/Test Engineering.
- Provide accurate failure information for root-cause analysis.
- Highlight abnormal increases in specific failure types.
- Support containment when repetitive failures suggest a process problem.
- Communicate suspected upstream SMT issues to the responsible team.
1. Rework & Retest Control
- Receive repaired/reworked PCBAs only through the approved process.
- Retest reworked assemblies using the released ICT program.
- Ensure the complete required test sequence is repeated before release.
- Maintain traceability of original failure and subsequent retest result.
- Segregate PCBAs that fail repeatedly and escalate to the responsible Engineer.
- Never repeatedly retest failed boards simply to obtain a PASS result without investigation.
1. ICT Fixture Handling
- Handle ICT fixtures carefully to avoid damage to:
- Test probes/pogo pins
- Connectors
- Cables
- Alignment pins
- Clamping mechanisms
- Interface boards
- Ensure the correct fixture is used for the specific PCB/PCBA model.
- Keep test fixtures clean and protected when not in use.
- Report bent, damaged, worn or contaminated probes immediately.
- Store fixtures at designated locations with clear identification.
1. Test Fixture & Contact Monitoring
- Monitor for contact-related false failures.
- Visually inspect accessible fixture contact points as permitted by the work instruction.
- Report recurring contact problems to Test/Maintenance Engineering.
- Do not make unauthorized modifications to fixtures or test probes.
- Support scheduled fixture cleaning and preventive-maintenance activities.
- Help differentiate probable fixture-contact issues from genuine product failures.
1. First-Off / Start-Up Testing
- Support first-piece/first-off testing after product changeover or production start.
- Verify the correct program and fixture before testing.
- Ensure first-off results are reviewed according to defined approval requirements.
- Do not release serial production based on incomplete or abnormal first-off results.
- Escalate unexpected failures immediately.
- Support Quality/Engineering during initial production verification.
1. Product Changeover
- Support ICT product/model changeovers.
- Ensure previous product and associated identification are cleared from the test station.
- Install/select the correct fixture and test program for the current product.
- Verify product, revision, fixture and program before testing begins.
- Support changeover checklist completion.
- Prevent wrong-program/wrong-fixture testing.
1. PCBA Traceability
- Maintain complete traceability of tested assemblies.
- Scan or record serial number, barcode, batch/lot and production order as applicable.
- Ensure ICT test results remain linked to the correct PCBA where traceability systems are implemented.
- Follow MES/barcode-system procedures where available.
- Report unreadable or missing traceability codes.
- Prevent testing or release of untraceable PCBAs without authorized disposition.
1. Test Data & Record Maintenance
- Maintain accurate records of:
- Quantity tested
- PASS quantity
- FAIL quantity
- Failure codes
- Retest results
- Fixture used
- Product/model
- Machine stoppage or abnormalities
- Complete manual/system records at the time of testing.
- Ensure records are accurate for quality investigations and audits.
- Protect test records from unauthorized alteration.
1. FPY & Defect Monitoring
- Support monitoring of First Pass Yield (FPY) at ICT.
- Communicate repetitive failure trends to Production/Quality/Test Engineering.
- Provide accurate test data for defect Pareto analysis.
- Support improvement actions aimed at reducing ICT failures.
- Monitor retest volume and recurring test failures.
- Participate in daily quality/production reviews when required.
1. Basic Equipment Monitoring
- Monitor ICT equipment condition during operation.
- Report:
- Equipment alarms
- Communication failures
- Fixture-contact issues
- Sensor problems
- Abnormal noises
- Test interruptions
- Software/test sequence abnormalities
- Stop testing if equipment behavior may compromise result validity.
- Coordinate with Maintenance/Test Engineering for restoration.
1. Basic Autonomous Maintenance
- Perform authorized operator-level daily checks and cleaning.
- Maintain cleanliness of ICT equipment and test station.
- Clean fixtures only using approved methods.
- Complete equipment daily-check sheets.
- Report damaged cables, connectors, switches or safety mechanisms.
- Support basic TPM/autonomous maintenance activities.
- Do not conduct electrical repairs without proper authorization.
1. ESD & PCBA Handling
- Follow defined ESD controls at all times.
- Use required ESD wrist straps, footwear, garments and grounded workstations.
- Use ESD-safe trays/racks for handling assemblies.
- Avoid unnecessary contact with components, solder joints and connector pins.
- Protect PCBAs against mechanical damage during loading/unloading.
- Report ESD-control abnormalities immediately.
1. Safety Compliance
- Follow equipment and electrical safety instructions.
- Operate the tester only after required training and authorization.
- Never bypass safety interlocks or guards.
- Do not access energized electrical sections beyond operator authorization.
- Use appropriate PPE where specified.
- Immediately report unsafe equipment conditions.
- Follow emergency-stop procedures where applicable.
1. 5S & Workplace Discipline
- Maintain 5S standards around the ICT test station.
- Clearly define locations for PASS, FAIL, Hold, Rework and untested PCBs.
- Keep fixtures, cables, tools and documents at designated locations.
- Prevent accumulation of unidentified PCBAs.
- Maintain a clean and organized workstation.
- Participate in periodic 5S audits.
1. Shift Handover
- Provide clear handover to the next-shift operator covering:
- Running product/model
- Tested/PASS/FAIL quantities
- Major failure types
- Rework/retest status
- Fixture condition
- Equipment problems
- Pending Quality/Engineering decisions
- Complete required records before end of shift.
- Highlight unresolved repetitive failures.
1. Continuous Improvement & Training
- Participate in Kaizen, TPM, FPY and defect-reduction activities.
- Provide practical feedback on recurring ICT failures and fixture issues.
- Support trials under Engineer guidance.
- Complete product/tester-specific operator training.
- Develop basic understanding of electronic components, PCB circuits and common SMT defects.
- Participate in periodic competency evaluation and multi-skilling activities.
Key Skills / Competencies
- ICT equipment operation
- PCBA electrical testing
- PASS/FAIL interpretation
- Basic understanding of resistor, capacitor, diode and circuit connectivity
- ICT fixture handling
- Test probe/pogo-pin awareness
- Defective-PCBA segregation
- Rework/retest control
- FPY and failure-code monitoring
- PCBA traceability
- Barcode/MES operation
- ESD-safe handling
- Basic TPM/autonomous maintenance
- 5S and shop-floor discipline
- Basic computer and test-data entry skills
📌 SMT : ICT (In-Circuit Testing) Operator (Chandigarh)
🏢 StepsWorths Consultancy Services
📍 Chandigarh