14 Nov
|
Adityaram Properties
|
Chennai
14 Nov
Adityaram Properties
Chennai
JOB DESCRIPTION
- QA/QC MANAGER (Civil & Infra) Company:Adityaram Group Experience12 to 15 Years Qualification: B.
E Civil
- Must 1. ROLE SUMMARY: QA/QC Senior Person will be the Quality Head for Entire Project
- From Plot Formation, Roads, Drains, STP, WTP to Villa Construction (Super Structure + Finishing) to High-Rise / Clubhouse / Convention Center ISMB Structure. He is responsible to ensure ZERO quality deviation and to give 5-star finishing to HNI Clients. He will have authority to STOP WORK if quality fails. 2.
KEY RESPONSIBILITIES
A. Plot Development & Layout Infra QA/QC (Most Important for You):
- Earthwork
- Filling, Compaction Testing (95% MDD), Level Checking with Total Station.
- Roads
- WMM, DBM, BT
- Cube Test, Core Test, Thickness, Camber, Compaction 100%.
- Storm Water Drains (RCC / DWC)
- Slope, Alignment, Leak Test, Bed Level.
- Sewage Line (RCC NP3)
- Hydro Test, Slope Checking (1:150), Manhole Water Tightness.
- Water Supply Line
- Pressure Testing 8-10 Kg for 24 Hrs.
- Retaining Wall, Compound Wall
- Alignment, Verticality, Foundation Depth. B. Villas Construction
- Structure
- Footing, Column, Beam, Slab
- Shuttering Line & Level, Steel
- Bar Bending Schedule Checking, Cover, Lapping, Cube Testing 7 & 28 Days.
- Block Work
- Alignment, Verticality, Mortar Ratio 1:5, Curing.
- Plastering
- Thickness 12-15mm, Surface Undulation 3mm in 3m, No Cracks
- Use of Fiber Mesh.
- Flooring
- Tile / Marble
- Hollow Sound Check, Joint Alignment, Slope in Toilet.
- Waterproofing
- Toilet, Terrace, Balcony
- Ponding Test 72 Hours
- MANDATORY
- No compromise.
- Painting
- Putty Thickness, Primer, Final Coat
- No patches, No colour variation. C. High-Rise / Clubhouse / Convention Center
- ISMB Structure
- Welding Quality
- DP Test, Bolt Tightness, Alignment, Verticality, Primer & Painting DFT Test.
- High-Rise
- Slump Test for each Transit Mixer, Cube Test,
Column Verticality with Plumb, Lift Core Verticality.
- Finishing for HNI Clients
- Palace Theme Finishing
- Mock-up Approval First, Then Execution. D. Laboratory & Documentation:
- Maintain Site Lab
- Cube Testing Machine, Sieve Analysis, Cement Test, Steel Test
- Every Batch.
- Material Inward Inspection
- Cement, Steel, Tiles, Electrical, Plumbing
- Approved Brand Only
- No Local Brand.
- Maintain Quality Checklists
- Pour Card, Shuttering Checklist, Steel Checklist, Plastering Checklist.
- NCR
- Non Conformance Report
- Raise NCR if contractor fails, Get Rectification Done.
- Prepare Monthly Quality Report with Photos to Management. E. Coordination:
- Coordinate with Architect, Structural Consultant, MEP Consultant for Quality Standards.
- Conduct Weekly Quality Meeting with All Contractors.
- Training to Site Engineers & Masons for Quality Awareness. 3. REQUIRED
SKILLS:
- Should have handled minimum 1 Township and High-Rise / Clubhouse Project
- This is Compulsory.
- Thorough Knowledge of IS Codes
- IS 456, IS 1200, IS 383, CPHEEO for Sewage/STP.
- Knowledge of Total Station, Auto Level, Cube Testing, Ultrasonic Testing.
- Robust in Finishing Quality
- Villas for HNI
- 5 Star Quality Eye.
- Knowledge of all type of Structure Quality Checking.
- Software
- MS Excel, AutoCAD, MS Word
- For Reports.
- Very Strict & Straight Forward
- Should not compromise for Site Team Pressure. 4. AUTHORITY:
- Authority to REJECT Material, STOP Concrete Pour, Dismantle Wrong Work
- Direct Power from Management.
- All bills must have QA/QC Sign
- Without QA/QC Sign, QS Team will not certify bill. 5. KPI
- How Performance Will Be Measured:
- Zero Structural Failures / Leakages
- Cube Test Failure
- Less than 2%
- Plastering Cracks
- Less than 1% Area
- Waterproofing Leakage
- Zero Complaints After Handover
- NCR Closure
- Within 3 Days
- Client Handover
- Zero Snag List for Finishing
📌 QA QC Manager (Chennai)
🏢 Adityaram Properties
📍 Chennai