15 Nov
|
Aditya Birla Insulators
|
Anantapur
15 Nov
Aditya Birla Insulators
Anantapur
### Job Summary To support SH EI in ensuring maximum plant availability improving productivity at optimum cost by supervising and coordinating safe operation and maintece activities of Electrical equipment s like Power supply, power distribution, motors, transformers, cables etc besides maintaining suitable spares for Plant and colony in line with the objectives of adhering highest standard of quality, quantity, safety and cost as per the business requirement. ### Job Context Major Challenges Ginigera Cement Works (GiCW): a unit of UltraTech Cement Limited, a flagship company of the Aditya Birla Group is situated at Ginigera. GiCW established in 2007 and Cement production started from with a production capacity 1.5 MTPA to manufacture Ordinary Portland Cement, Portland Pozzolana Cement, Portland Slag Cement at Village: Ginigera, Tehsil: Koppal, District Koppal (Karnataka). The focus area for Job holder is to ensure operation and maintece activities of Electrical equipment s in plant and colony and also for providing timely and accurate information to Management for taking strategic decisions. Liaison with government authorities and ensuring zero non compliances by fulfilling all statutory compliances. ### Major Challenges
- 1. To increase the operational efficiency of the EI equipment s.
- 2. To reduce the unscheduled stoppages.
- 3. To Manage all EI Activities with revised manpower requires a need to build capabilities of team to handle both roles.
- 4. Less availability of equipment s for maintece due to high dispatches and fluctuating demands effects the equipment efficiency. ### Key Result Areas
- KRA1 Plant Availability: Ensuring preventive maintece activities as per plan for Electrical equipment s
- KRA1 Plant Availability: Ensuring timely and orderly completion of planned Jobs in shutdown by proper scheduling and preparations
- KRA1 Plant Availability: Workout to fulfil the material manpower requirement.
- KRA1 Plant Availability: Study stoppage report and take corrective action.
- KRA1 Plant Availability: Supervise coordinate electrical maintece activities to maximize the plant availability.
- KRA1 Plant Availability: Taking plant round, supervise maintece jobs, coordinate with other dept. / Sections for plant performance improvement job.
- KRA1 Plant Availability:
Identify the abnormalities unsafe conditions at site and doing modifications / upgradations on continuous basis to improve plant performance.
- KRA1 Plant Availability: Analyses the frequent problems, tripping, breakdowns.
- KRA1 Plant Availability: Identify areas requiring improvements.
- KRA1 Plant Availability: Carryout why-why analysis, review drawings / specifications.
- KRA2 Cost Optimization: Accurate projection of demand for material requirement to avoid stacking up of inventory.
- KRA2 Cost Optimization: Time Preparations of PR / PO s and Reservations slips for issuing material.
- KRA2 Cost Optimization: Driving cost saving activities in the section by Proposing and implementing action plan for power optimization.
- KRA2 Cost Optimization: Controlling Overtime
- KRA2 Cost Optimization: Preparing power reports for monitoring electrical consumption.
- KRA3 Management Information System: Ensuring timely submission of monthly MIS
- KRA3 Management Information System: Ensuring timely submission of Section Provisions like Flash Cost, Bills, PR etc.
- KRA3 Management Information System: Timely and accurate preparation of Presentations, Reports etc as required by Management from time to time
- KRA3 Management Information System: Supporting and handling various internal and external audits.
- KRA4 Shutdown Jobs Performing: Prepare the job list for shutdown as per priority for the plant.
- KRA4 Shutdown Jobs Performing: Proper Job planning for shutdown jobs.
- KRA4 Shutdown Jobs Performing: Planning of contractor jobs to be carried out and raise service work order accordingly.
- KRA4 Shutdown Jobs Performing: Spare parts planning for major shutdown jobs as well as fulfilling day today basis requirements.
- KRA4 Shutdown Jobs Performing: Planning and procurement of advanced good quality tools and tackles for fast execution of jobs
- KRA5 System Management (Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition quality standards)
-To implement improvement project to reduce repetitive problems/breakdown or losses.
- KRA5 System Management: Timely submission of Kaizen, OPL, Good to fine, suggestion on system
- KRA5 System Management: Developing and sustaining Model area in respective sections
- KRA5 System Management: 100% active participation in respective KFA GRT meetings and giving inputs related to bring new technology, innovation and improvements towards productivity. Conduct awareness programs down the level team
- KRA5 System Management: To know about IMS and other systems requirement and documents for Non-Conformity in section during internal and external audits or assessments.
- KRA5 System Management: Implementation of critical spares consumable SOP without any defilement
- KRA5 System Management: Identify arrange rectification of leakage points/unsafe points along with monitor take corrective action for emission levels.
- KRA6 Focus on SHE (Safety, Health Environment) along with Sustainability initiatives: 1. Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area.
- KRA6: Educating team about I know my job , I know the hazards associated with my job and I applied control measures I escalate to my senior among manpower deployed in sections/department manpower including peer, WB CL manpower
- KRA6: Timely conducting scheduled SO round and reporting of accidents, incidents and near misses on occurrences in the area of concern in system.
- KRA6: To conduct daily Tool Box Talk as schedule and before start the job any critical job along with SWP
- KRA6: Active participation in safety training, safety sub committees, standard champions meeting and any safety event
- KRA6: Ensure positive housekeeping, limited use of power, no leakage of water, oil, air etc and reporting concerned if any abnormalities for corrective action
- KRA6: Adhering of all safety precautions on the site and off the site
- KRA6: Replicating good practice for saving environment for long run sustainability and creating awareness among manpower to save guard natural resources. Disclaimer: This job posting has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.
📌 PF Electrical Professional (Anantapur)
🏢 Aditya Birla Insulators
📍 Anantapur