17 Nov
|
Versigent
|
Bengaluru
17 Nov
Versigent
Bengaluru
Key Responsibilities
Kia Customer Coordination & Front-Facing Planning
- Direct Customer Liaison: Act as the direct point of contact for the Kia Materials & Logistics team,
aligning factory output with shifting customer demand windows and assembly line priorities.
- Kia Portal & EDI Management: Oversee daily material synchronization, delivery confirmations, and
demand spikes through Kia’s specific supplier portals and SRM systems.
- Engineering Change Control (ECO): Manage production phase-ins and phase-outs smoothly during
Kia product variations or model year modifications without disrupting the master schedule.
Versigent Manufacturing Line Scheduling
- Versigent Process Synchronization: Build daily, weekly, and monthly master production schedules
(MPS) that strictly align with the unique cadence, cycle times, and constraints of Versigent's automated assembly lines.
- Capacity & Run Validation: Execute rigorous process capacity audits across specialized electrical
architecture assembly and cell layouts to ensure localized lines can absorb Kia's long-to-mid term production targets.
- Inventory & Lot Traceability: Oversee inventory turns (raw materials, WIP, finished goods) to minimize
carrying costs, while enforcing strict serialization and lot control parameters mandatory for automated component tracking.
- Material Requirements Planning (MRP): Coordinate with the procurement and warehouse teams to
guarantee raw materials and critical electronic/metal components are staged before production runs begin.
Key Performance Indicators (KPIs)
MPS & Production Control Metrics
- Schedule Attainment / MPS Adherence: Target >98% compliance of actual production matching the
planned master production schedule.
- Plan Stability Index: Minimise unauthorized, short-term changes to the frozen window schedule to
protect shop-floor efficiency.
- Capacity Utilization Rate: Optimize bottleneck work centres to run within the targeted 80-85% capacity
window. Customer & Supply Chain Metrics
- Delivery Schedule Adherence (DSA): Target 100% on-time delivery to Kia assembly plants.
- Premium Freight Costs: Target $0 emergency expediting costs resulting from internal planning or
customer communication lag.
- Inventory Days on Hand (DOH): Maintain optimal Days of Inventory to maximize cash flow while
completely preventing stockouts. Privacy Notice - Active Candidates: https://www.versigent.com/privacy-statement
Versigent is an equal employment prospect employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, national origin, sex, gender identity, sexual orientation, disability status, protected veteran status or any other characteristic protected by law.
📌 Production Planner (Bengaluru)
🏢 Versigent
📍 Bengaluru