Lead Planning Engineer (Khambhat)

Lead Planning Engineer (Khambhat)

17 Nov
|
Tolani Projects
|
Khambhat

17 Nov

Tolani Projects

Khambhat

Lead Planning Engineer (Storage Tank EPC)

Company: Tolani Projects Private Limited

Location: Bhaskar Field, Central Processing Facility (CPF), Pandad-Tamsa Road, Village: Pandad, Tal: Khambhat, Dist: Anand, Gujarat 388625.

Minimum experience: 5 years in the relevant field.

Minimum qualification: B.Tech in Mechanical Engineering.

Application / communication email: [email protected]

Role Summary

Lead planning, scheduling and progress control for the crude oil storage tank EPC project. Integrate engineering, procurement, supply, fabrication, civil works, erection, inspection, testing and commissioning into a coordinated execution schedule; provide reliable progress visibility, early warnings and recovery planning to project management.

Project Context The LOA covers six site-fabricated crude oil storage tanks, each 30 m internal diameter 10.8 m height, with associated civil, piping, electrical, instrumentation, cathodic protection and fire safety scope. The contractual completion schedule is 18 months from the LOA dated 29.10.2026, with reasonable efforts required to complete within 16 months while maintaining quality, safety and full scope compliance. The 16-month effort target must not be represented as replacing the 18-month contractual schedule.

Draft role responsibilities are adapted from the LOA and existing storage-tank JD. Detailed tender requirements, bulletins and post-bid clarifications were not supplied; scheduling assumptions, progress measurement rules and staffing arrangements require confirmation against the approved contract documents.

1. Key Responsibilities

Integrated Planning & Scheduling
- Develop and maintain an integrated baseline schedule and work breakdown covering engineering, procurement, supply, fabrication, civil works, erection, inspection, testing and commissioning.
- Build tank-wise and discipline-wise activities, dependencies and milestones; integrate foundations/dyke works, tank appurtenances,



piping/heating coils, electrical, instrumentation, cathodic protection, firefighting, calibration and hydrotest.
- Maintain the contractual 18-month completion basis and a separate 16-month effort-target plan, subject to project approval and quality/safety constraints.

Progress Measurement & Reporting
- Establish agreed progress measurement and reporting formats; collect and validate engineering, procurement and site progress with responsible teams.
- Maintain planned-versus-actual trackers, look-ahead schedules, milestone reports and management/client dashboards.
- Track work performed and accepted against the Annexure-A scope breakdown; provide validated progress evidence to support monthly progressive billing without assuming unapproved weightings.

Procurement, Resources & Site Interfaces
- Track drawing approvals, vendor commitments, material deliveries and fabrication readiness against site requirements.
- Coordinate manpower, equipment and material needs with execution teams; identify constraints affecting tank-wise and discipline-wise work fronts.
- Integrate inspection hold points, hydrotest, calibration, pre-commissioning and commissioning readiness into the schedule with QA/QC and discipline teams.

Risk, Recovery & Change Control
- Analyse critical activities, dependencies, delays and emerging risks; issue early warnings and propose practical recovery options.
- Assess scope changes and execution deviations for schedule impact; maintain revision history and supporting records for project review.




- Prepare recovery schedules with responsible teams, track agreed actions and report unresolved constraints to project management.

Completion & Closeout
- Track mechanical completion, punch-list closure, documentation, commissioning and handover milestones.
- Maintain final progress records and capture scheduling lessons learned for project closeout.

1. Technical Knowledge & Skills

- Proficiency in MS Project or Primavera P6, and MS Excel for schedules, trackers, resource plans and progress reporting.
- Understanding of EPC sequencing for API 650 storage tanks and associated civil, piping, electrical, instrumentation and fire safety interfaces.
- Ability to develop work breakdown structures, identify critical paths, manage dependencies and maintain baseline/revised schedules.
- Ability to validate progress quantities and documentary evidence, monitor procurement milestones and assess schedule impacts.
- Working familiarity with drawing review, document control, testing/commissioning milestones and progress support for monthly billing.

1. Personal Attributes

- Analytical thinking, accurate reporting and disciplined follow-up on constraints and commitments.
- Strong coordination and communication with engineering, procurement, construction, QA/QC and project management.
- Proactive risk identification and practical problem-solving under changing site priorities.

1. Key Performance Indicators

- Timely preparation and maintenance of approved baseline, update and look-ahead schedules.
- Accuracy, consistency and timeliness of validated progress reports.
- Early identification of critical delays and timely follow-up on recovery actions.
- Visibility of drawing, procurement, resource and inspection constraints affecting execution.
- Reliable progress evidence for billing and transparent tracking of completion/commissioning milestones.

📌 Lead Planning Engineer (Khambhat)
🏢 Tolani Projects
📍 Khambhat

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: lead planning engineer (khambhat) / khambhat

Subscribe to this job alert:

Get the latest job offers by email for: lead planning engineer (khambhat) / khambhat