- Drive workmen productivity improvement across manufacturing departments.
- Conduct time and motion studies to establish standard production time and manpower requirements.
- Monitor department-wise productivity, output per man-hour and workforce utilization.
- Identify manpower deployment gaps, idle time, bottlenecks and non-value-added activities.
- Optimize manpower requirements based on production volumes and product mix.
- Improve line balancing, production cycle time and workflow efficiency.
- Drive cost reduction through manpower optimization, process improvement and resource utilization.
- Implement Lean Manufacturing, Kaizen, 5S and continuous improvement initiatives.
- Conduct capacity utilization studies for machines, production lines and manpower.
- Develop productivity MIS and monitor actual performance against established standards.
- Coordinate with Production, HR, Quality and Maintenance teams to achieve productivity targets.
2. Key Performance Indicators (KPIs)
- Improvement in workmen productivity (output per man-hour).
- Manpower optimization and utilization.
- Reduction in manpower cost per unit.
- Reduction in overtime and idle manpower hours.
- Improvement in production efficiency and cycle time.
- Reduction in conversion cost.
- Implementation of Kaizen and productivity improvement projects.
Preferred candidate profile
Educational Qualification
B.Tech / B.E. in Industrial, Mechanical or Production Engineering. Diploma holders with relevant experience may also be considered.
Experience
5-9 years of experience in Industrial Engineering / Manufacturing Excellence, preferably in building materials, sanitaryware, faucets, pipes, ceramics or similar manufacturing industries.
Required Skills
- Strong knowledge of time and motion studies.
- Hands-on experience in workmen productivity and manpower optimization.
- Knowledge of Lean Manufacturing, Kaizen and 5S.
- Solid analytical and problem-solving skills.
- Proficiency in MS Excel and production MIS.
Ability to work closely with shop-floor teams and drive measurable improvements