Production Planning & Scheduling The primary goal is to ensure that the presses are running at maximum capacity with minimum downtime.
Job Sequencing: Prioritizing jobs based on urgency, paper type, and ink requirements (e.g., grouping jobs with similar spot colors to reduce wash-up time).
Machine Allocation: Deciding which job goes to which press (e.g., a 4-color job on a 5-color press vs. a 6-color press).
Timeline Management: Creating a master production schedule that accounts for every stage: Pre-press rightarrow Press rightarrow Post-press (Binding/Finishing).
- Resource & Material Management A printer cannot run without paper or plates. PPC ensures everything is ready before the "Start" button is pressed.
Inventory Control: Tracking stock levels of paper, ink, plates, and binding supplies (glue, wire, thread).
Procurement Coordination: Issuing purchase requisitions for job-specific substrates or special Pantone inks.
Wastage Monitoring: Calculating expected "make-ready" waste and ensuring the paper issued includes enough "overs" for the binding process.
- Technical Coordination (Pre-press to Binding)
PPC acts as the bridge between the sales office and the factory floor.
Job Ticket Creation: Translating customer requirements into clear technical instructions (the "Job Bag").
Imposition Approval: Ensuring the layout (how pages are positioned on a sheet) is optimized for both the press size and the specific folding machine in the binding department.
Outsource Management: If a job requires a process not available in-house (e.g., specialized foil stamping or UV coating), PPC manages the logistics with external vendors.
- Monitoring & Quality Control
PPC is responsible for tracking the "live" status of every job.
WIP (Work in Progress) Tracking: Monitoring the movement of printed sheets from the press room to the binding unit.
Note: In sheetfed printing, "curing time" is critical. PPC must ensure sheets are dry enough to be folded or laminated to avoid "set-off" (ink smearing).
Bottleneck Identification: If a folding machine breaks down, PPC must immediately re-route or re-schedule to prevent a pile-up of printed sheets.
- Key Performance Indicators (KPIs)
A PPC skilled is usually evaluated on the following: