- Identify and calculate the fresh air requirements for positive pressurization & exhaust requirements and incorporate them in Heat Load
- Prepare HVAC specification as per DBM, Scope of work and company specifications
- Obtain preliminary equipment selection from vendor as per the HAP report
- Prepare Equipment and duct layout as per the HAP report with by coordinating with drafting team Select air terminals as per specification, space availability and airflow rate
- Identify the requirements for MSFD, GTD, PRD as per company specification
- Identification of Hazardous area classification, Gas group and Temperature class Preparation of Datasheets for HVAC equipment. Preparation of Control Schematics, Input/ Output Schedule and Cause &
- Effect Chart for the HVAC system
- Calculate ESP &
- Pump Head as per Ducting and Piping Layout.
Define
Sequence of Operation, Interlocks and Alarm Set point Limits as per specification.
Material
Take-off as per the design.
- Preparation of Material Requisition document for the project.
- Design Review Presentation to the client. Ensuring compliance with industry standards codes and regulations. Coordinating with other disciplines to ensure integrated design solutions.
- Procurement Support: Assist in Bill of Quantities (BOQ) preparation, material sourcing, and vendor/supplier evaluations.
Preferred candidate profile
- Bachelors Degree in Mechanical Engineering or Refrigeration &
- Air Conditioning
- AutoCad, HAP (Hourly Analysis Program), Ms office software's.
- Knowledge of chillers, VRF/VRV systems, package units, and duct fabrication standards (SMACNA/ASHRAE)