Basic Engineering a) Designing of PLC System requirement b) UPS sizing calculation c) Designing of Control & Instrumentation Cables d) Designing of Local Control Panels, Junction Box etc.
e) Selection of various instruments
Detailed Engineering
a) Preparation of PLC system Configuration Diagram, Input Output list, etc. for PLC system b) Preparation PLC or DCS I/O list with KKS Tag c) Preparation of Control & Instrumentation Cable Schedule d) Preparation of Inter connection diagram e) Preparation of Block logic diagram f) Preparation/checking of Schemes of Local Control Panels, VFDs g) Preparation of Instrument Schedule or Instrument list h) Preparation of Instrument Datasheets i) Preparation of Control Write up.
Procurement
a) Preparation of Technical documents for procurement.
b) Technical evaluation of Vendor Offers.
c) Follow up with vendors.
Inspection and Quality Assurance
a) Inspection of C&I; equipments b) Evaluation of Quality documents of Vendors
Commissioning a) Commissioning support at site at time of Commissioning