20 Nov
|
Larsen and Toubro
|
Vadodara
20 Nov
Larsen and Toubro
Vadodara
• Experience in Engineering management preferably in Boiler industry/Thermal power plants
• Develop comprehensive project plans, including scope, objectives, timelines, and budgets.
• Finalization of Master Document List including Customer Submission List as per L2/L3 schedule. Leading the team and providing inputs to Planning group for finalization of L2/L3 network.
• Engineering coordination, Close Monitoring & Follow-up with all internal & external stakeholders to ensure release of inter-departmental inputs and inputs from/to EPC Contractor to meet the deliverables target dates.
• Foster a collaborative and productive work environment.
• Provide technical direction to ensure the successful execution of engineering projects.
• Ensuring timely release of all MDL documents, Customer Submissions, Construction drawings, PG Test procedures, O&M; Manuals.
• Leading the team to resolve all internal engineering interface issues and with EPC Contractor. Updating senior team on progress & constraints on regular basis
• Communicate project progress, status, and issues to stakeholders, including clients, executives, and team members.
• Conducting Meetings with Customer on Monthly basis for resolution on Customer Comments thereby ensuring Customer Approval. Address client concerns and maintain strong client relationships.
• Ensuring Timely closure of Pre-order TQs with vendors, release of TER, TER closure and ordering of BoIs/Packages
• Ensuring timely closure of vendor engineering. Interaction with Shop and ensuring resolution on manufacturing related queries.
• Proactively manage and address issues that may impact project success.
• Engaging outsourcing agencies for detailed engineering based on the requirement, Ensuring timely work delegation, monitoring progress on regular basis, etc.
• Sorting out engineering related site interface issues with EPC Contractor on regular basis. In-depth analysis of site issues to avoid similar problems in future projects.
• Ensuring design optimization w.r.t material and process and BOQ reduction based on the Targets set by Head-Engineering on annual basis. Ensuring reduction in drawings revision due to internal errors.
• Identify and assess project risks and develop risk mitigation plans.
• Ensure that engineering projects adhere to industry standards, codes, and regulatory requirements.
• Maintain accurate and organized project documentation, including design documents, project reports, and change orders.
• Identify opportunities for process improvement and efficiency.
• Implement best practices and lessons learned from previous projects – UTTHAN workshops.
• Adoption of Digitization like WRENCH and maximum automation in MDL status spreadsheet reports
• Implementation of Power BI dashboards and digital tools for enhanced management reporting and decision-making.
• Proactively monitored project milestones to identify risks early, implement mid-course corrections, and escalate issues as required.
• maintaining all status reports and complete data on Server without any exception.
📌 MANAGER-PROJECT ENGINEERING (Vadodara)
🏢 Larsen and Toubro
📍 Vadodara