21 Nov
|
DongAh Electric India Private
|
India
21 Nov
DongAh Electric India Private
India
i) Check SMD production equipment status — operating time, downtime, errors, and corrective actions.
ii) Temperature Profile Check — Reflow & Wave Solder
iii) Production Plan vs. Actual Review — Shortfall Analysis & Summary
iv) Production Equipment Troubles & Corrective Actions
v) Daily Production Plan Load Analysis — Overtime & Weekend Work Instructions
vi) Address quality issues raised by in-house customers, implement
improvements, and provide operator training.
vii) SMD Hourly Check — Verify MES Material Scanning by Operators to Prevent Wrong Part Mounting
viii) Verify Start-up OK/NG Master Sample Check at Each Inspection Process
ix) 3R 5S Check
x) Production Output, UPH & OEE Management and Reporting
xi) Review R&D; sample PCBs in advance and build them. For initial production
APCBs, measure MLCCs with an LCR meter, check for wrong part mounting, and report any improvement items to R&D.;
xii)"Create the SMD placement program for the recent model and release it to production.
xiii) New PCB ICT Program Debugging — Verify Measured Values Against Part List
xiv)
Review weekly production results and implement recurrence prevention measures for defects caused by process operators.
xv)PCB Line Efficiency Improvement — Request to R&D; for Increased Panel Array to Maximize Component Count per Machine Capacity
xvi) Analyze SMD and manual insertion capacity against the production plan, compare available and required man-hours, and report any shortage.
xvii) Request approval and place orders for equipment consumable parts, ICT fixtures, and metal masks.
xviii) Replace equipment consumable parts and perform maintenance on a monthly basis.
xix) Provide 2-hour operator training once a month covering PCB production work, ESD control, component identification, and soldering.
xx) Hold one-on-one meetings with operators to discuss difficulties in their work
process and any personal concerns.
xxi) Check WIP and inventory monthly, and prepare an approval request for scrapping monthly process defects.
xxii) Material Loss Management
Pay: From ₹1,300,000.00 per year
Benefits:
- Food provided
- Health insurance
- Provident Fund
Work Location: In person
📌 SMT MANAGER (India)
🏢 DongAh Electric India Private
📍 India