22 Nov
|
Switchgear And Control Technics
|
Bengaluru
22 Nov
Switchgear And Control Technics
Bengaluru
Job Summary
We are looking for an experienced Project Manager to lead the end-to-end execution of Supply, Installation, Testing Commissioning (SITC) projects for LV/MV electrical panels. The role owns projects from order receipt through drawing approval, manufacturing coordination with the plant, site installation, testing, commissioning and final handover. Hands-on experience in data centre projects is Beneficial, zas is a willingness to travel to and stay at project sites as required.
Key Responsibilities
- 1.
Project Planning
Execution Prepare detailed project execution plans, schedules (MS Project / Primavera) and resource plans from the purchase order and technical specifications.
- Drive projects through the full SITC cycle - engineering, procurement, manufacturing, dispatch, installation, testing, commissioning and handover.
- Track progress against baseline schedule, cost and quality targets; publish regular progress reports to management and customers.
- Manage project budgets, variations, change orders and billing milestones to protect margins and cash flow.
- 2.
Customer
Management Act as the single point of contact for customers, consultants, PMCs and EPC contractors throughout the project.
- Conduct kick-off meetings, progress reviews and site coordination meetings; maintain minutes and action trackers.
- Manage customer expectations, resolve technical and commercial issues promptly, and build long-term relationships for repeat business.
- Coordinate customer inspections, Factory Acceptance Tests (FAT) and witness tests.
- Ensure timely collection of payments and closure of punch points, handover documents and completion certificates.
- 3.
Drawing Document
Approval Coordinate with the design team for preparation of GA drawings, SLDs, schematics, wiring diagrams, BOMs and cable schedules.
- Submit drawings and technical documents to customers/consultants,
track comments and secure approvals within agreed timelines.
- Manage revision control and ensure only approved drawings are released to the plant for manufacturing.
- Prepare and submit QAP, test procedures, OM manuals and as-built drawings.
- 4.
Internal Plant Operations
Coordination Coordinate with design, purchase, production, QA/QC, stores and dispatch teams to meet manufacturing and delivery schedules.
- Release approved drawings and BOMs to production and follow up on material availability and long-lead items (breakers, busbars, relays, enclosures).
- Monitor shop-floor progress, resolve bottlenecks and ensure in-house testing and quality checks are completed before dispatch.
- Plan logistics, packing and dispatch in line with site readiness.
- 5. Site Execution, Testing Commissioning Travel to project sites to supervise installation, cable termination, testing and commissioning of panels.
- Manage site engineers, technicians and subcontractors; ensure adherence to safety (HSE) norms and statutory requirements.
- Coordinate pre-commissioning checks, IR / HV tests, relay testing, functional checks and integration with other systems (DG, UPS, BMS/EPMS).
- Close punch lists, obtain SAT sign-off and ensure smooth handover to the customer.
- 6.
Planning Risk
Mitigation Identify technical, commercial, schedule and site risks early; maintain a risk register with mitigation and contingency plans.
- Anticipate delays in approvals, materials or site readiness and take corrective action proactively.
- Ensure contractual compliance, including LD clauses, warranties and scope boundaries.
- Conduct project close-out reviews and capture lessons learned for future projects.
- Data Centre Project Experience
- Main LT Panels (PCC/MCC), Power Distribution Units (PDUs), UPS input/output panels, AMF/synchronisation panels and busduct interfaces.
- Understanding of redundancy architectures (N, N+1, 2N) and Tier III / Tier IV design requirements.
- Working within fast-track schedules, strict quality documentation and multi-stakeholder environments (owner, consultant, PMC, EPC).
- Integrated System Testing (IST) and Level 1-5 commissioning processes.
Required Qualifications Experience
- B.E. / B.Tech in Electrical Engineering.
- Minimum 5 years of experience in project management of SITC of LV/MV electrical panels.
- Proven track record of delivering at least one data centre project end to end.
- Sound knowledge of relevant standards - IEC 61439.
- Working knowledge of AutoCAD (reading/reviewing drawings), MS Project / Primavera and MS Office.
- PMP or equivalent project management certification will be an advantage.
Key Skills Competencies
- Planning: Strong project planning, scheduling and cost control.
- Customer Handling: Confident, qualified communication with customers and consultants.
- Coordination: Ability to align design, production and site teams toward common deadlines.
- Problem Solving: Quick, practical decision-making under site pressure.
- Leadership: Leading site teams and subcontractors safely and efficiently.
- Mobility: Willing to
Disclaimer: This job posting has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.
📌 Project Manager (Bengaluru)
🏢 Switchgear And Control Technics
📍 Bengaluru