Lead IE - Plant (Pune)

Lead IE - Plant (Pune)

23 Nov
|
OPmobility
|
Pune

23 Nov

OPmobility

Pune

1. Capacity, Line Balancing Programming

Conduct time studies, method studies, and work measurement for SMT processes (Screen Printing, Pick Place, Reflow, AOI, ICT, Functional Testing, etc.).

AOI Programming specially for Fuzi Machine and Panasonic Machine

Solder Paste Printer Programming Knowledge specially for Fuzi Machine and Panasonic Machine.

Prepare and maintain line balancing charts for maximum efficiency.

Plan and optimize manpower requirements per shift and per line.

2. Process Optimization Layout Planning

Design and implement optimal shopfloor layouts for SMT lines, ensuring smooth material flow and minimal handling.

Drive continuous improvement initiatives (Kaizen, Lean, Six Sigma) to enhance productivity and reduce waste.

Support current product introduction (NPI) from an IE perspective - capacity study, tooling/jig design support, and SOP creation

3. Productivity Cost Improvements

Monitor KPIs such as OEE, UPH (Units per Hour), and cycle time for SMT lines

Identify cost-reduction opportunities in processes, consumables, and manpower allocation.

Evaluate SMT equipment utilization and propose upgrades/replacements where necessary.

Using FMEA techniques

4. Industrial Engineering Documentation

Prepare and update work instructions, standard operating procedures (SOPs), and visual aids for SMT operations.





Maintain and control IE documentation for audits (ISO, IATF, customer audits).

Conduct ergonomic assessments for operators and propose improvements.

1. MAJOR CHALLENGES

(Challenges faced on an on-going basis in carrying out the job)

- Dealing with multiple urgencies

- Timely support form Production and other stakeholders to compliance IE norms

- Dealing with different project specific requirements

2. DECISIONS

(Key decisions which the role needs to escalate to superior)

- Delay or no support from production/Quality to necessary inputs

- Delay or no support from RD to drawing specified standards if any

- Decision about project priority

3. DIMENSIONS

(Key numerical data which will reflect the scope and scale of activities concerning this job)

Financial Dimensions

(These should be quantifiable numerical amounts)

- OEE improvement percentage for SMT lines

- Reduction in cycle time / takt time achievement.

- Manpower productivity improvement.

Disclaimer: This job posting has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.

📌 Lead IE - Plant (Pune)
🏢 OPmobility
📍 Pune

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: lead ie - plant (pune) / pune

Subscribe to this job alert:

Get the latest job offers by email for: lead ie - plant (pune) / pune