SH Mechanical - Sewagram Cement Works Professional (Jamnagar)

SH Mechanical - Sewagram Cement Works Professional (Jamnagar)

26 Nov
|
Aditya Birla Insulators
|
Jamnagar

26 Nov

Aditya Birla Insulators

Jamnagar

Job Summary

Supervise co-ordinate execution of Operation maintece activities in the section to maximize plant availability to improve productivity at minimum maintece cost.

Job Context Major Challenges

UltraTech Cement Limited has an annual capacity of 52 million tonnes. It manufactures and markets Ordinary Portland Cement Portland Blast Furnace Slag Cement and Portland Pozzalana Cement. It also manufactures ready mix concrete (RMC). The company has 11 integrated plants, one white cement plant, one clinkerisation plant in UAE, 15 grinding units (11 in India). UltraTech Cement is the country largest exporter of cement clinker. The export markets span countries around the Indian Ocean, Africa, Europe and the Middle East. Sewagram Cement Works was commissioned in 2009. The plant has clinker capacity of 3.6 MTPA and cement capacity of 2.4 MTPA. The Unit has two captive power plants (CPP) CPP-I with 35 MV and CPP-II with 22.5 MV capacity. The Unit has mines with reserve of 246.45 MT, a captive jetty, a desalination plant that can filter around 20 lakh litres of water every day and a bag-making plant. The plant also has an environmental cell which monitors air and water quality, audits, and conducts marine ecological studies and environmental studies of mines and nearby villages.

Job Challenges

To reduce Breakdowns and improving plant availability. To reduce the maintece cost and manpower cost.

Key Result Areas (KRA)

KRA1 Operation Maintece Jobs

- Supervise coordinate all operation maintece activities of the section to maximize the plant availability to achieve production as per targets. Study stoppage report
- Study checklist
- Take corrective preventive action.




- Take plant round
- Supervise maintece jobs
- Coordinate for conditional monitoring.
- Develop SAP data.
- Scheduling of shutdown jobs.
- Workout material/ manpower requirement.
- Organize material / manpower required.
- Prepare indents.
- Follow-up for material requirement.

KRA2 Cost Optimisation

- Study and analyze and maintece cost of the section compared to budget norms and implement action plans to optimize consumption/ maintece cost. Prepare budgets.
- Monitor actual cost with budget.
- Take corrective actions.
- Monitor inventory.
- Attend task force meeting
- Identify Kaizen/focused improvement area.
- Study abnormalities / deviations
- Analyse problematic areas
- Review material requirement inventory.
- Control contractor cost.
- Control over time.

KRA3 Modification / Upgradation

- Identify and carryout proposals for modifications / up-gradations for improvement in plant working on continuous basis in the section Analyse problems, breakdowns.
- Identify areas requiring improvement
- Carryout why-why analysis.
- Review drawings / specifications
- Formulate proposal.
- Implement approved proposals.
- Attend improvement meetings.
- Review Technical Cell suggestions and implement.

KRA4 Safety statutory compliance





- Carryout timely inspection of all jobs required as per statutory guidelines and ensure their timely compliance. Carryout the required checking, testing as per guidelines.
- Maintain statutory records of the observations.
- Take corrective measures for deviations.
- Identify rectify unsafe points unsafe practice in the area.
- On the job training to staff workmen on safety treatment.

KRA5 System Implementation

- Organize and implement ISO, EMS, OHSAS, SA 8000 and WCM systems in his area of operation through the involvement of people for the improvement of quality standards and productivity. Identify and execute improvement study and kaizen.
- Identify get rectified: Abnormalities.
- Spillage/leakages.
- Unsafe conditions/practices.
- 5S activities.
- Points emerged in campaigns.
- Execute implementation plan for Strategic quality projects.
- Quality improvement objectives.
- Improvement of WCM criteria score.
- EMS targets.
- Internal customer rating improvement.
- ISO system improvement.
- Statutory compliance.
- Improvement of OEE/MTBF/MTTR
- Elimination of muda.
- Does why why analysis.
- Prepare/present weekly/monthly WCM presentation.
- Develop one point lesson.
- Update WCM activity boards.
- Develop Model area.
- Create awareness in team members.
- Develop visual controls.
- Monitor working of pollution control equipments.

Disclaimer: This job posting and Location has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.

📌 SH Mechanical - Sewagram Cement Works Professional (Jamnagar)
🏢 Aditya Birla Insulators
📍 Jamnagar

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: sh mechanical - sewagram cement works professional (jamnagar) / jamnagar

Subscribe to this job alert:

Get the latest job offers by email for: sh mechanical - sewagram cement works professional (jamnagar) / jamnagar