Job Purpose
Organize, implement and monitor Power Plant Maintenance to improve the reliability & availability of mechanical equipment to achieve targeted Production with Zero quality losses, Delivery & Environmental losses, ensuring compliance to safety, environmental & Indian Boiler Regulation (IBR) norms.
Job Context & Major Challenges
Job Context
Harihar Polyfibers was started in 1972 with 100 TPD production using indigenous machinery and technology. This is the only integrated Pulp & Fibre units in the business, which demands for continuous availability of Pulp for our Fibre plant. Currently plant is operating at 210 TPD production.
Steam & Power generated and distributed from the Captive Power Plant is a key factor for quality & throughput in continuous pulp production process. Hence maintaining an uninterrupted supply of steam/power is an essential requirement for the CPP. Over period of time, there has been technological upgradations/modifications in TG Set & Recovery Boiler which has led to stringent operation & maintenance requirements. The Captive Power Plant works with High pressure Recovery Boiler & TG set, which are critical equipment subject to stringent legal, safety and environmental requirements.
Hence CPP operations cater to plant requirements in a demanding scenario.
Major Challenges
- Sustain Power Plant equipment availability under highly corrosive environment
- Maintenance actions to increase uptime of old machinery to sustain production levels
- Continued development/indigenization of imported equipment parts & spares
- Due to intensive manual operations it's a challenge to ensure safety of employees
Key Result Areas
KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)
KRA1 Maintenance
Managing day to day maintenance activities
- Organize & control daily maintenance activities of Power Plant equipment to ensure the availability of all equipment.
- Coordinate Preventive Maintenance / breakdown maintenance / stoppage with operations
- Prepare & Implement Standard Maintenance Procedures (SMP) for all equipment.
- Prepare & Monitor Equipment Maintenance Plan (PM schedules & Lubrication schedules)
- Analyse & take actions based on Predictive / Preventive maintenance trends
- Ensure Spares and Assembly Preparation
- Integrate Maintenance activities with Condition monitoring and Planning Cell
KRA2 Cost Optimization
To initiate cost reduction plan/measures.
- Control overtime & initiate corrective actions to minimize overtime
- Perform Life Value analysis for design and Material of Construction Change & implement actions
- Improve productivity by eliminating Non Value Adding activities & wastages in the section.
- Monitor SOP compliance to avoid equipment stoppage/breakdown
- Implement cost effective practically applicable budget schemes to ensure Work services are met.
KRA3 Spares Management
- Ensure optimum availability of spares & consumables
- Execute inspection of equipment / spares periodically
- Coordinate for localization of high value & high lead time OEM spares by interacting with vendors
- Develop sub component drawings and specifications
- Monitor & ensure sub assembly inter-changeability for continuous availability of equipment
KRA4 Continuous Improvement Projects Implement the proposed projects ensuring that all SOPs are followed
KRA5 Ensure Safety & Environment Compliance
- Implement improvement actions to reduce pollution at source
- Implement safety standards in section as per unit safety guidelines in accordance with PSAP
- Implement & close the safety & environment audit observations
- Follow environmental standards for smooth plant operations
- Ensure proper handling of hazardous chemicals
- Ensure immediate rectification in case of abnormalities
- Implement processes for energy saving & resource conservation
- Implement & monitor energy productive products and services.
KRA6 System Implementation
- Implementation of QMS, EMS, EnMS & OHSMS
- Implementation of departmental objectives & targets
- Implementation of SAP activities