Worli, Mumbai. Role Overview Coordinate and Manage MEPF design activities for large scale high rise building project, hotels, commercial and Mixed-Use Projects. 1. Electrical (EL)
• Review connected load and maximum demand calculations.
• Evaluate HT incomer requirements and electrical substation location.
• Review transformer and DG set capacities.
• Plan UPS systems and essential power supplies.
• Coordinate electrical distribution, load balancing and backup power requirements. 2. Plumbing (PL) and Public Health Engineering
• Review domestic water, flushing water and HVAC make-up water requirements.
• Assess firefighting water storage requirements.
• Review water treatment plant (WTP) and sewage treatment plant (STP) capacities.
• Evaluate water recycling, reuse and discharge arrangements.
• Coordinate drainage networks and discharge points. 3. Audio-Visual (AV) Systems
• Plan AV requirements for hotel ballrooms and conference facilities.
• Coordinate retail digital signage systems.
• Review lobby displays, presentation systems and integrated AV infrastructure.
• Ensure AV integration with IT and building management systems. 4. HVAC Systems
• Review block cooling loads based on building occupancy and functional usage.
• Evaluate energy efficiency targets and green building rating requirements.
• Assess central chilled water, VRF and district cooling solutions.
• Conduct first-cost versus lifecycle-cost assessments.
• Review chillers, AHUs, cooling towers and ducting systems.
• Plan HVAC equipment rooms,
service shafts and plant-room allocations across all 35 floors.
• Ensure coordination of HVAC services with architectural and structural designs. 5. IT and Data Infrastructure
• Coordinate telecom service providers and incoming carrier infrastructure.
• Assess data centre and server room requirements.
• Plan tenant connectivity and structured cabling infrastructure.
• Review network infrastructure and integration requirements. 6. Building Management System (BMS)
• Define systems to be monitored and controlled through BMS.
• Ensure integration of HVAC, electrical, lighting, water management and other building services.
• Review open communication protocols and interoperability requirements.
• Coordinate with individual system vendors for seamless integration. 7. Fire Alarm and Public Address (PA) Systems
• Review addressable fire alarm system architecture.
• Establish fire alarm zoning in accordance with the approved fire strategy.
• Coordinate fire alarm integration with firefighting and smoke management systems.
• Review background music and general paging requirements.
• Ensure emergency voice evacuation and public address system integration. 8. Site Coordination and Construction Support
• Verify existing underground utilities against approved site surveys.
• Coordinate utility protection, relocation or diversion requirements.
• Review temporary power and water arrangements.
• Coordinate dewatering systems and discharge arrangements.
• Conduct full time pre-pour inspections to verify:
• Earthing and electrical provisions.
• Sump locations and drainage arrangements.
• MEP sleeves and embedded conduits.
• Underground service provisions.
• Coordination of openings and service penetrations.