27 Nov
|
Grasim Industries Limited Aditya Birla Group
|
Karnataka
27 Nov
Grasim Industries Limited Aditya Birla Group
Karnataka
Job Purpose Organize, implement and monitor Power Plant Maintenance to improve the reliability & availability of mechanical equipment to achieve targeted Production with Zero quality losses, Delivery & Environmental losses, ensuring compliance to safety, environmental & Indian Boiler Regulation (IBR) norms. Job Context & Major Challenges Job Context Harihar Polyfibers was started in 1972 with 100 TPD production using indigenous machinery and technology. This is the only integrated Pulp & Fibre units in the business, which demands for continuous availability of Pulp for our Fibre plant. Currently plant is operating at 210 TPD production. Steam & Power generated and distributed from the Captive Power Plant is a key factor for quality & throughput in continuous pulp production process. Hence maintaining an uninterrupted supply of steam/power is an essential requirement for the CPP. Over period of time, there has been technological upgradations/modifications in TG Set & Recovery Boiler which has led to stringent operation & maintenance requirements. The Captive Power Plant works with High pressure Recovery Boiler & TG set, which are critical equipment subject to stringent legal, safety and environmental requirements. Hence CPP operations cater to plant requirements in a demanding scenario. Major Challenges
• Sustain Power Plant equipment availability under highly corrosive environment
• Maintenance actions to increase uptime of old machinery to sustain production levels
• Continued development/indigenization of imported equipment parts & spares
• Due to intensive manual operations it’s a challenge to ensure safety of employees Key Result Areas KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters) KRA1 Maintenance Managing day to day maintenance activities
• Organize & control daily maintenance activities of Power Plant equipment to ensure the availability of all equipment.
• Coordinate Preventive Maintenance / breakdown maintenance / stoppage with operations
• Prepare & Implement Standard Maintenance Procedures (SMP) for all equipment.
• Prepare & Monitor Equipment Maintenance Plan (PM schedules & Lubrication schedules)
• Analyse & take actions based on Predictive / Preventive maintenance trends
• Ensure Spares and Assembly Preparation
• Integrate Maintenance activities with Condition monitoring and Planning Cell KRA2 Cost Optimization To initiate cost reduction plan/measures.
• Control overtime & initiate corrective actions to minimize overtime
• Perform Life Value analysis for design and Material of Construction Change & implement actions
• Improve productivity by eliminating Non Value Adding activities & wastages in the section.
• Monitor SOP compliance to avoid equipment stoppage/breakdown
• Implement cost effective practically applicable budget schemes to ensure Work services are met. KRA3 Spares Management
• Ensure optimum availability of spares & consumables
• Execute inspection of equipment / spares periodically
• Coordinate for localization of high value & high lead time OEM spares by interacting with vendors
• Develop sub component drawings and specifications
• Monitor & ensure sub assembly inter-changeability for continuous availability of equipment KRA4 Continuous Improvement Projects Implement the proposed projects ensuring that all SOPs are followed KRA5 Ensure Safety & Setting Compliance
• Implement improvement actions to reduce pollution at source
• Implement safety standards in section as per unit safety guidelines in accordance with PSAP
• Implement & close the safety & environment audit observations
• Follow environmental standards for smooth plant operations
• Ensure proper handling of hazardous chemicals
• Ensure immediate rectification in case of abnormalities
• Implement processes for energy saving & resource conservation
• Implement & monitor energy efficient products and services. KRA6 System Implementation
• Implementation of QMS, EMS, EnMS & OHSMS
• Implementation of departmental objectives & targets
• Implementation of SAP activities
📌 FLO-Power Plant (Karnataka)
🏢 Grasim Industries Limited Aditya Birla Group
📍 Karnataka