Basic Engineering
a) Designing of PLC System requirement
b) UPS sizing calculation
c) Designing of Control & Instrumentation Cables
d) Designing of Local Control Panels, Junction Box etc.
e) Selection of various instruments
Detailed Engineering:
a) Preparation of PLC system Configuration Diagram, Input Output list, etc. for PLC system
b) Preparation PLC or DCS I/O list with KKS Tag
c) Preparation of Control & Instrumentation Cable Schedule
d) Preparation of Inter connection diagram
e) Preparation of Block logic diagram
f) Preparation/checking of Schemes of Local Control Panels, VFDs
g) Preparation of Instrument Schedule or Instrument list
h) Preparation of Instrument Datasheets
i) Preparation of Control Write up.
Procurement:
a) Preparation of Technical documents for procurement.
b) Technical evaluation of Vendor Offers.
c) Follow up with vendors.
Inspection and Quality Assurance:
a) Inspection of C&I; equipments
b) Evaluation of Quality documents of Vendors
Commissioning
a) Commissioning support at site at time of Commissioning