28 Nov
|
SED-AMENITY PLOT NO 2
|
Pimpri-Chinchwad
28 Nov
SED-AMENITY PLOT NO 2
Pimpri-Chinchwad
PROJECT ENGINEER – HIGH-RISE BUILDINGS
Key Responsibilities:
1. RCC Execution:
Supervise and execute RCC works, including foundations, columns, shear walls, beams, slabs, staircases and lift cores, as per approved structural drawings and specifications.
2. Planning Scheduling:
Prepare daily and weekly work plans, coordinate resources and monitor progress against project milestones.
3. Manpower Contractor Management:
Coordinate with civil contractors, subcontractors, supervisors and labour teams to achieve planned productivity.
4. Quality Control:
Ensure quality of reinforcement, shuttering, concrete, cover blocks, concrete cover, alignment, levels and dimensions as per approved drawings and specifications.
5. Shuttering Reinforcement:
Check formwork stability, reinforcement detailing, lap lengths, development lengths, spacing, cover and embedded items before concrete pouring.
6. Pre-Pour Inspection:
Conduct pre-pour checks, coordinate consultant inspections and obtain necessary approvals before concreting.
7. Concrete Operations:
Monitor concrete pouring, slump tests, cube sampling, vibration, finishing, curing and post-pour quality.
8. Drawing Coordination:
Study structural and architectural drawings,
identify discrepancies and coordinate with the Project Manager, RCC consultant and architect for timely resolution.
9. Material Management:
Prepare material requirements for reinforcement steel, concrete, shuttering materials and consumables in coordination with the stores and purchase departments.
10. Safety Compliance:
Ensure implementation of safety procedures during work at height, scaffolding, formwork, reinforcement and concreting activities.
11. Progress Reporting:
Maintain daily progress reports, manpower records, concrete pour records, inspection checklists and work completion reports.
12. Measurement Billing:
Verify contractor measurements, maintain joint measurement records and check RA bills against actual work executed.
13. Resource Productivity:
Monitor labour productivity, material consumption and equipment utilisation, and take corrective action to minimise wastage and delays.
14. Interdepartmental Coordination:
Coordinate with MEP, finishing, planning, quality and safety teams to ensure smooth execution without rework.
15. Site Housekeeping:
Maintain proper site organisation, material stacking, access routes and housekeeping standards
📌 Project Engineer (Pimpri-Chinchwad)
🏢 SED-AMENITY PLOT NO 2
📍 Pimpri-Chinchwad