28 Nov
|
Aishwaryam Group
|
Pimpri-Chinchwad
28 Nov
Aishwaryam Group
Pimpri-Chinchwad
PROJECT ENGINEER – HIGH-RISE BUILDINGS
Key Responsibilities
• RCC Execution: Supervise and execute RCC works, including foundations, columns, shear walls, beams, slabs, staircases and lift cores, as per approved structural drawings and specifications.
• Planning Scheduling: Prepare daily and weekly work plans, coordinate resources and monitor progress against project milestones.
• Manpower Contractor Management: Coordinate with civil contractors, subcontractors, supervisors and labour teams to achieve planned productivity.
• Quality Control: Ensure quality of reinforcement, shuttering, concrete, cover blocks, concrete cover, alignment, levels and dimensions as per approved drawings and specifications.
• Shuttering Reinforcement: Check formwork stability, reinforcement detailing, lap lengths, development lengths, spacing, cover and embedded items before concrete pouring.
• Pre-Pour Inspection: Conduct pre-pour checks, coordinate consultant inspections and obtain necessary approvals before concreting.
• Concrete Operations: Monitor concrete pouring, slump tests, cube sampling, vibration, finishing, curing and post-pour quality.
• Drawing Coordination: Study structural and architectural drawings,
identify discrepancies and coordinate with the Project Manager, RCC consultant and architect for timely resolution.
• Material Management: Prepare material requirements for reinforcement steel, concrete, shuttering materials and consumables in coordination with the stores and purchase departments.
• Safety Compliance: Ensure implementation of safety procedures during work at height, scaffolding, formwork, reinforcement and concreting activities.
• Progress Reporting: Maintain daily progress reports, manpower records, concrete pour records, inspection checklists and work completion reports.
• Measurement Billing: Verify contractor measurements, maintain joint measurement records and check RA bills against actual work executed.
• Resource Productivity: Monitor labour productivity, material consumption and equipment utilisation, and take corrective action to minimise wastage and delays.
• Interdepartmental Coordination: Coordinate with MEP, finishing, planning, quality and safety teams to ensure smooth execution without rework.
• Site Housekeeping: Maintain proper site organisation, material stacking, access routes and housekeeping standards
📌 Project Engineer (Pimpri-Chinchwad)
🏢 Aishwaryam Group
📍 Pimpri-Chinchwad