PENAL OPERATION OF SLITTING
SIZE CHANGE WORK ON SLITTING
COIL IDENTIFICATION AND FILL COIL SLITTING REPORT
TO FOLLOW DEFINED GUIDELINES/ SOPS FOR PROTECTED WORK OPERATION
TO USE/ CONSUME UTILITIES WITH RESPECT (NO WASTAGE)
TO STOP THE SLITTING OPERATION IF ANY NON CONFORMITY ON PLATE AND COIL.
CHANGE SLITTING CUTTER IF REQUIRED.
SET MACHINE AND CUT THE COILS ACCORDING TO REQUIRED NORMS
CHECK THE WIDTH, GRADE, COIL NO. AND COIL THICKNESS OF THE COIL BEFORE SLITTING AS PER SLITTING PLAN
NO MISTAKE IN TRACEABILITY OF THE SLIT COILS AND PLATES
LOADING OF PROPER COILS FOR SLITTING
CHECK THE QUALITY OF THE SLITTING AFTER RECOILER
MAINTAIN SAFETY AND HOUSEKEEPING IN SLITTING AREA
MAINTAIN SPARES OF SLITTING CUTTERS AND SEPARATOR SPACERS
TO ACHIEVE ZERO ACCIDENT IN SLITTING M/C OPERATION
TO ACHIEVE ZERO TOLERANCE OF ENVIRONMENTAL DEVIATION INCLUDING COMPLIANCE
5 TO 10 YEARS EXPERIENCE IN PRODUCTION DEPARTMENT IN PIPE SHOLUD BE CONVERSANT WITH SAFETY, HOUSE KEEPING & ISO 9001 & API Q1 AWARENESS.