- To get the fire system fabrication and installation as per drawings.
- To execute the Fire piping work as per site layout and drawings and site conditions •
- To verify the estimate for Projects/Change request recommended by Mgmt & execution within stipulated timeline.
- To ensure initiation of appropriate Purchase requisition as per the BOM in appropriate WBS.
- Tracking of material through MPS and coordinating with the purchase team.
- Getting inspected the entire procured item at site before use. Ensure no waste of material by contractor during execution.
- Monitoring of Execution of all the planned activity with good manufacturing practices and within scheduled time through Site activity schedule.
- Reconciliation of balance material.
- Verification of contractor measurement timely & bill booking.
- Monitoring work permit implementation during project work
- Maintain work culture for Zero incident at work place.
- Monitoring of Proper housekeeping at project site & contractor yard