19 Aug
|
Cadila Pharmaceuticals
|
Dholka
19 Aug
Cadila Pharmaceuticals
Dholka
"• To operate Water system RO1, RO2, RO3, RO5 plant as per SOP at Dholka.
- To carry out Preventive maintenance of Water system equipment’s.
- Treatment of Water to be done in Water system as per SOP.
- Records to be update as per cGMP norms.
- To avoid major breakdown, preventive maintenance of Water system to be done as per SOP.
- Ensure efficient operation and maintenance of water system up to user point.
- Carry out the preventive maintenance as scheduled for the year.
- Prompt attention to breakdown maintenance • All water System Equipment’s must always be in a valuable condition.
- Modification & development work in machinery as per guidance of engineer.
- Timely reports of materials needed for maintenance and routing operation.
- Writing of daily report.
- Ensure that working environment is kept clean always.
- Safe and proper use of tools.
- Report any strange observation to site engineer.
- Do not leave duty until hand over charge to reliever OR inform to superior."
📌 RO Operator (Dholka)
🏢 Cadila Pharmaceuticals
📍 Dholka