• Responsible for piping activities & Erection activities as per P&ID;, ISO & GA drawing
Responsible for the erection of equipment like Chiller, Boiler, Reactors, Cooling tower, ANFD, Centrifuge, ETP & RO unit.
Responsible for commissioning activities & pre start up activities: Pneumatic/ Hydro as per process requirement.
Responsible for the clearance of vendor bill.
Responsible for MOC, PSSR & HAZOP activities.
Responsible to keep machine health by proper planning and development of the Preventive, Predictive maintenance schedule and its proper execution as per the laid safety standards of the group.
Driving the maintenance services to ensure the smoothness off all equipment’s by effectively & minimum down time.
Cost saving by reducing utility load.
To carry out preventive, breakdown, predictive and corrective maintenance / Utilities activities as per schedule.
Utility equipment health monitoring
Coordinated with vendors and arranged necessary supplies
Reduction of inventory by standardization and interchangeability of spares.
Ensure waste minimization.
Responding for AMC of Equipments.
Planning & executing shut down activities of all rotatory & static equipment’s.
Spares management, PR/PO, material Indenting, procurement, inspection of spares and inventory controls.
Maintaining daily record of utility consumption.
Introduce continuous improvement practices to boost the plant productivity.
Cost monitoring, generating monthly reports related to utility services.
Modification in system as per process requirement & Energy saving
Initiated for utility related energy conservation by modifying different systems and achieved energy conservation
Energy saving by chiller system modification.
Energy saving by compressed Air system leakage arresting system
Reduced equipment costs by adopting proper preventive schedule as well as ‘in house development of spares.’