:
To get the fire system fabrication and installation as per drawings.
To execute the Fire piping work as per site layout and drawings and site conditions •
To verify the estimate for Projects/Change request recommended by Mgmt & execution within stipulated timeline.
To ensure initiation of appropriate Purchase requisition as per the BOM in appropriate WBS.
Tracking of material through MPS and coordinating with the purchase team.
Getting inspected the entire procured item at site before use. Ensure no waste of material by contractor during execution.
Monitoring of Execution of all the planned activity with positive manufacturing practices and within scheduled time through Site activity schedule.
Reconciliation of balance material.
Verification of contractor measurement timely & bill booking.
Monitoring work permit implementation during project work
Maintain work culture for Zero incident at work place.
Monitoring of Proper housekeeping at project site & contractor yard