& , & .
Join us and contribute to impactful projects across water & wastewater infrastructure, resilience planning, and sustainable design.
: Hyderabad
- Visakhapatnam/Pune
: 30th Oct (Friday), 31st Oct (Saturday), & 1st Nov (Sunday)
:
• 5 to 12 years in design & detailed engineering
• , ,
:
OR Interested candidates can mail me on -
[email protected]
Key Accountabilities:
- Electrical equipment sizing, calculations, and selection
- Lighting and earthing Calculation
- Preparation of technical specifications, reports, schedules, data sheets and deliverables
- Preparation of General Arrangement drawings
- Complete Control Building and GIS Building Design
- Preparation/review of Bid analysis & Vendor/Supplier documents Review
- Condition assessment
- Preparation of Bill of Quantities
- Conduit development
- Carry out other duties as may be assigned from time to time by supervisor/management,
- Need to work off-hours for client co-ordination:
Occasionally
- Need to travel offshore for training / in office work: Occasionally
Preferred candidate profile
- Bachelor/ masters degree in Electrical engineering.
- 7 to 10 years of experience in Electrical Substation for Both AIS & GIS Stations, Renewable energy.
- Experience in with balance of plant related activities such as Sub-station, Material handling.
- Experience in Co-ordination with Customer and Suppliers.
- Experience in System Studies & Primary, Secondary Knowledge in substation design.
- Experience in Electrical Equipment sizing, Cable sizing.
- Experience in preparation of Bill of Material for Complete Substation with proper. Components / Equipment selection as per Customer Specification and Requirements.
Location : Visakhapatnam & Pune
📌 Substation Electrical Engineer (AIS/ GIS) (Energy) (Up To 400 KV)
🏢 Stantec
📍 Visakhapatnam