22 Oct
|
Adani Group
|
Waidhan
22 Oct
Adani Group
Waidhan
Responsibilities
Turbine &
- Auxiliary Commissioning
- Execute and monitor commissioning activities of Steam Turbine, Generator, and associated auxiliary systems.
- Support system-wise commissioning from mechanical completion to final handover.
- Ensure commissioning activities are completed as per approved procedures, schedules, and OEM recommendations.
- Coordinate commissioning activities with Project, Construction, Electrical, C&I;, and Operation teams.
Turbine Systems &
- AuxiliariesParticipate in commissioning activities related to:
- Steam Turbine (HP/IP/LP)
- Turbine Generator (TG)
- Condenser System
- CEP (Condensate Extraction Pumps)
- BFP/BFP Turbine
- Vacuum System
- Gland Steam System
- Seal Oil System
- Lube Oil System
- EOT &
- Auxiliary Cooling Systems
- Stator Water System
- Hydrogen System
- CW &
- ACW Systems
- Turbine Bypass System
- Turbine Protection System
- Turbine Auxiliaries and Associated Mechanical Systems
Startup &
- Commissioning ActivitiesSupport and execute:
- System Flushing Activities
- Lube Oil Flushing
- Steam Line Blowing Activities
- Turbine Pre-Commissioning Checks
- Turbine Rolling
- Vacuum Pulling
- Synchronization Activities
- Reliability Runs
- Performance Guarantee Tests (PGT)
- Turbine Protection Logic Verification
- Trial Operation and Load Raising Activities
Planning &
- Coordination
- Prepare and monitor commissioning schedules and progress plans.
- Coordinate with EPC contractors, OEMs, consultants, and project stakeholders.
- Review drawings, commissioning procedures, system checklists, and readiness plans.
- Ensure resolution of commissioning punch points and interface issues.
Safety &
- Quality Compliance
- Ensure compliance with Adani Power safety standards, PTW, LOTO, and statutory requirements.
- Participate in JSA, HIRA, commissioning risk reviews, and safety audits.
- Ensure commissioning activities are carried out as per approved quality standards and commissioning methodologies.
- Promote a zero-incident and zero-harm work culture.
Documentation &
- Reporting
- Prepare and maintain commissioning reports and progress updates.
- Monitor resource deployment, commissioning status, and milestone achievement.
- Ensure closure of commissioning checklists, test records, and handover documentation.
- Support smooth system handover to Operations &
- Maintenance teams.
Qualifications
Essential Qualification
B.E. / B.Tech in Mechanical Engineering from a recognized University / Institute.
Experience
5 – 8 Years of relevant experience in Thermal Power Plant Projects.
Mandatory Experience
- Minimum 5 years of experience in Turbine Erection, Pre-Commissioning, Commissioning, Startup, or O&M; support activities.
- Experience in 500 MW, 600 MW, 660 MW, or higher capacity thermal power units.
- Hands-on exposure to:
- Steam Turbine Systems
- Turbine Auxiliaries
- Condenser Systems
- CEP &
- BFP Systems
- Vacuum Systems
- Seal Oil Systems
- Lube Oil Systems
- Turbine Generator Support Systems
- Experience in major commissioning milestones such as:
- Lube Oil Flushing
- Turbine Rolling
- Vacuum Pulling
- Synchronization
- Reliability Run
- Performance Testing
Essential Areas of Expertise
- Steam Turbine Commissioning
- Turbine Auxiliary Systems
- Condenser &
- Vacuum Systems
- CEP &
- BFP Systems
- Lube Oil System Commissioning
- Seal Oil System Commissioning
- Hydrogen &
- Stator Water Systems
- Turbine Rolling &
- Synchronization
- Reliability Run &
- Performance Testing
- Turbine Startup Procedures
- Commissioning Planning &
- Execution
- Troubleshooting &
- System Readiness
- Safety &
- Quality Compliance
- Project Coordination &
- Stakeholder Management
Must-Have Skills
- Steam Turbine Commissioning
- Turbine Auxiliary Systems
- Turbine Startup &
- Synchronization
- Condenser &
- Vacuum System Operation
- Lube Oil Flushing &
- System Commissioning
- Root Cause Analysis (RCA)
- Commissioning Documentation
- PTW / LOTO Compliance
- Contractor &
- Vendor Coordination
- Technical Problem Solving
📌 Assistant Manager - Mechanical Projects - Turbine & Aux (Waidhan)
🏢 Adani Group
📍 Waidhan