· Need to address the L2 level issue in ODA, CCA and LAA.
· Handling Issues in the existing GSPM parameter.
· Interest booking or application issue.
· Current scheme code parameterization.
· PSP,OS upgradation, Infosys patch testing.
· Ultra Saver issue fixing.
· EOD batch job failure rectification on daily basis as and when required.
· Handling new customization patch testing.
· Need to resolve L2 call related to the OD, CC & TL