11 Nov
|
Larsen u0026 Toubro
|
Chennai
11 Nov
Larsen u0026 Toubro
Chennai
Design of Steel Enabling Structures for Metros or Bridges
Casting & Stacking Yard Design, Schemes.
Design of Launching girders for erection of box girder of superstructure.
Design of Short line, Longline moulds for precast box girder segment pre casting works.
Design of Mould shutters for I-Girders, U-Girders etc.
Design of Pier/Pier cap shutters for Viaduct, Design and Development of Erection schemes for elevated viaduct, Full span erection of precast Box Girder, On Site Mould & LG Commissioning Experience.
Underground Metros - Station Construction methods, Strut & waler, Anchor waler, Capping beam, Traffic decking & Muck decking, Gantry supporting system, Casting yard design for Establishment, Equipment mobilisation design, Erection schemes Excavation & Dewatering scheme.
Utilities management Supporting system – Tunnel, Lowering & Assembly, Segment handling methods reaction frame & Cradle, TBM rolling stock movement, Shaft work area planning.
📌 Engineering Manager - Construction Methods- Design (Chennai)
🏢 Larsen u0026 Toubro
📍 Chennai