11 Sep
|
EVIO Private
|
Hyderabad
11 Sep
EVIO Private
Hyderabad
We are looking for Electrical Engineer for Data Center Projects.
Electrical Engineer - 4 Opening
Project Manager - 1 Opening
Assistant Project Manager - 2 Opening
Sr. Electrical Engineer - 2 Opening
Location: Hyderabad
We are seeking a skilled and motivated PM/ APM/Sr / Electrical Engineer - Data Center - Construction project with a solid background in construction and site execution. The ideal candidate will have hands-on experience in Electrical Installation Works across Commercial, Residential, and IT Building projects. The role requires site-based project execution, coordination with clients, contractors, and internal teams to ensure timely and quality project delivery.
Key Responsibilities
Supervise and execute electrical installation works such as:
Cable laying (Power & Control)Cable tray installation LT / HT Panel installation and termination
Conduit and wiring work (Light, Power, and DB circuits)
Lighting fixture installation and testing
Review and interpret electrical drawings, BOQs, and specifications.
Plan daily and weekly site activities, manpower, and materials.
Coordinate with subcontractors for timely work execution.
Conduct quality inspections, testing, and commissioning of electrical systems
Ensure adherence to safety and quality standards at site.
Prepare and maintain daily progress reports, material records, and work checklists.
Support Project Manager in billing documentation and material reconciliation.
Candidate Requirements:
Knowledge of electrical installation standards.
Familiarity with cable sizing, load distribution and panel connections.
Hands-on experience with AutoCAD drawings, MS Office, and site reporting.
Should be able to read and understand electrical drawings.
Data center workplace experience is preferred
📌 Pm/ Apm/sr / Electrical Engineer Data Center Construction Hyderabad
🏢 EVIO Private
📍 Hyderabad