31 Oct
|
Adani Enterprises
|
India
31 Oct
Adani Enterprises
India
Responsibilities
Manage overall BESS plant operations to ensure protected and reliable functioning.
Monitor Battery Racks, PCS (Power Conversion System), EMS, SCADA, Transformer, HT/LT systems, and auxiliary systems.
Ensure maximum plant availability and energy dispatch efficiency.
Lead preventive, predictive, and corrective maintenance activities.
Analyze system failures and implement corrective actions.
- Develop asset reliability strategies and maintenance plans.
Monitor battery performance, degradation trends, and lifecycle management.
Drive root cause analysis (RCA) and implement reliability improvements.
Optimize plant performance through data-driven decision-making.
Qualifications
B.E./B.Tech in Electrical, Electrical & Electronics, Power Systems, Instrumentation, or related discipline.
M.Tech/MBA preferred.
📌 Incharge Bess Bhuj (India)
🏢 Adani Enterprises
📍 India