09 Nov
|
N R Constructions
|
Rajamahendravaram
09 Nov
N R Constructions
Rajamahendravaram
Job Summary :
We are hiring an experienced and results-driven Civil Engineer to oversee site execution for urban infrastructure projects encompassing Cement Concrete (CC) Roads, Bituminous (BT) Roads, Cross-Drainage Culverts, Stormwater Drains, and Town Development Works. The incumbent will be directly responsible for day-to-day site execution, level surveying, contractor supervision, quality compliance per MORTH/IRC/CPWD standards, joint measurements, and RA billing.
We are hiring for the following positions:
1. Project Manager - 1 No. (15-25 Years of Experience)
2. Dy Project Manager - 1 No. (10-20 Years of Experience)
3. Sr. Engineer - 2 Nos. (8-12 Years of Experience)
4. Asst. Engineer - 3 Nos (5-8 Years of Experience)
5. Jr. Engineer - 3 Nos (3-5 Years of Experience)
Key Roles and Responsibilities:
1. CC & BT Road Construction Execution
- Execute rigid pavements (CC roads: PQC, DLC, GSB) and flexible pavements (BT roads: Subgrade, GSB, WMM, Prime/Tack coats, DBM, BC) strictly as per approved drawings and MORTH / IRC specifications.
- Supervise formwork, reinforcement, tie bars, dowel bars, joint cutting, and groove sealing for CC roads.
- Enforce temperature control during asphalt production, laying, and compaction (breakdown, intermediate, and finish rolling) for BT roads.
- Ensure subgrade and base compaction achieve the designated Maximum Dry Density (MDD 98%).
2. Culverts & Cross-Drainage (CD) Works
- Supervise setting out, foundation excavation, dewatering, and reinforcement detailing (BBS) for RCC Box Culverts, Slab Culverts, and Hume Pipe (NP3/NP4) Culverts.
- Verify bed invert levels, curtain walls, drop walls, wing walls, and stone pitching/aprons to prevent scour and stagnation.
- Ensure proper granular bedding and minimum soil cushioning over pipe culverts before opening traffic.
3. Town Development & Municipal Infrastructure
- Execute roadside stormwater drainage systems (RCC covered drains, precast drains, catch basins, and silt traps) with proper slope gradients to outfall points.
- Supervise utility trenching/ducting (drinking water pipelines, sewage lines, electrical cable ducts) beneath footpaths to avoid post-road-laying cuts.
- Oversee pedestrian walkways, kerb casting, median development, paver block installation, road safety signages, and thermoplastic road markings.
4. Surveying, Quality Control & Material Management
- Establish and verify Temporary Bench Marks (TBM), centerline coordinates, finished road levels (FRL), and camber/super-elevation using Auto Level and Total Station.
- Coordinate with QA/QC lab teams to maintain test registers: sieve analysis, aggregate impact/flakiness, core cutting, Marshall stability, field density tests, and concrete cube test registers (7 & 28 days).
- Monitor daily concrete/asphalt batching plant dispatches, slump checks at pour sites, and minimize in office material wastage.
5. Billing, Measurement Books & Reporting
- Record joint site measurements in Measurement Books (M-Books) alongside client/consultant representatives.
- Prepare Running Account (RA) bills, sub-contractor bills, reconciliation statements for cement/steel/bitumen, and rate analysis for extra items.
- Prepare Daily Progress Reports (DPR), weekly physical progress updates, and look-ahead schedules.
- Implement site safety barricading, diversion signage, and personal protective equipment (PPE) protocols.
📌 Project Manager/Dy Project Manager/Sr. Engineer/Asst. Engineer & JE (Rajamahendravaram)
🏢 N R Constructions
📍 Rajamahendravaram